General Background This water center provides drinking water and fire fighting supply to the city of Hadera with a population of 85,000. BJ-IS prepared the general and detailed designs including civil, mechanical, electrical, and control engineering, and provided general supervision services on site. Basic Design Data
Average Design Flow: 11,000 m3/day
Water Tank Volume - 5,000 m3
Maximum Design Hourly Flow: 1,100 m3/hour
Number of pumps: 4
Pumping station duty point: Flow:1,100 m3/hour Head:65 m
Bet Yizhaq Sewage Pumping Station
General Background This Pumping Station serves the city of Netanya with a population of 350,000. BJIS prepared the general and detailed designs including civil, mechanical, electrical, and control engineering and provided general supervision services at site.
Basic Design Data Average Design Flow: 120,000 m3/day Maximum Design Hourly Flow: 7,500 m3/hour Number of pumps: 6 Pump duty point: Flow: 3,000 m3/hour Head: 18 m