Abuja (Nigeria) Wastewater Treatment Plant
General Background This W.W.T.P serves the city of Abuja, the Capital of the federal republic of Nigeria. During its first phase of construction the W.W.T.P will serve a population of 700,000, and will be expanded in the future. BJIS prepared the general and the detailed designs including process, civil, mechanical, electrical, and control engineering and the general construction supervision. Basic Design Data Average Design Flow (m3/day): 131,200 Average B.O.D. Load (Kg/day): 66,000 Effluent Quality (BOD/TSS/N): 15/20/10 ![]()
Afula Wastewater Treatment Plant
General Background Afula W.W.T.P serves the municipality of Afula, population of 60,000, and some of the near-by army facilities.. The plant was built in the late 90's and will be upgraded in the future in order to improve sludge stabilization in order to comply with the Israeli standards for sludge treatment and disposal. The effluents are reclaimed for unrestricted agriculture use. BJIS provided complete design services including general design and detailed design, and general supervision of construction. Basic Design Data Average Design Flow (m3/day): 10,000 Average B.O.D. Load (Kg/day): 3,850 Effluent Quality (BOD/TSS/N): 15/20/10
Akko Regional Waste-water Treatment General Background This W.W.T.P serves 8 municipalities having a population of 175,000. The plant was constructed under a B.O.T contract. BJIS prepared the general and detailed designs including process civil, mechanical, electrical and control engineering and provided the general supervision of construction. Basic Design Data Average Design Flow (m3/day): 28,200 Average B.O.D. Load (Kg/day): 13,000 Effluent Quality (BOD/TSS/N): 15/15/10 ![]()
Akko Regional Waste-water Treatment
General Background This W.W.T.P serves 8 municipalities having a population of 175,000. The plant was constructed under a B.O.T contract. BJIS prepared the general and detailed designs including process civil, mechanical, electrical and control engineering and provided the general supervision of construction. Basic Design Data Average Design Flow (m3/day): 28,200 Average B.O.D. Load (Kg/day): 13,000 Effluent Quality (BOD/TSS/N): 15/15/10 ![]()
Ein Bokek (Dead Sea) Waste-water Treatment Plant
General Background Ein Bokek W.W.T.P serves all of the hotels and the touristic facilities along the Dead-Sea areas of Ein-Bokek, Hamey-Zohar and Neve-Zohar, as well as the Tamar regional council. The plant was originally built in the early 80's and was expanded in the late 90's due to the accelerated construction activities in the touristic zones. The plant consists of the original module plus two new modules. A significant challenge in the plant's design was the very high salinity value of the incoming wastes, due it's proximity to the Dead Sea. The process designed by BJIS successfully addressed this challenge. The effluents are re-used for public gardening along the streets surrounding the hotels. BJIS provided general design and complete detailed design services for the original construction, and for the expansion. Basic Design Data Average Design Flow (m3/day): 5,100 Average B.O.D. Load (Kg/day): 1,700 Effluent Quality (BOD/TSS/N): 15/15/10 ![]()
Haifa Regional Waste-water Treatment Plant
General Background This W.W.T.P serves 11 municipalities with a population of 800,000. The treatment plant was originally built in the early 60's for a population of 225,000 and was the first municipal sewage treatment plant in Israel. The first expansion and upgrading of the W.W.T.P took place in the mid 70's to increase its capacity for a population of 560,000. The second upgrading and expansion took place in the late 90's to increase its capacity for a population of 800,000. BJIS prepared the general and detailed designs of the first and second expansion including process, civil, mechanical, and electrical and control engineering, and provided general supervision of the construction. Basic Design Facts Average Design Flow (m3/day): 120,000 Average B.O.D. Load (Kg/day): 69,000 Effluent Quality (BOD/TSS/N): 15/15/10 ![]()
Karmi'el regional Waste-water Treatment Plant General Background This W.W.P.T serves 13 municipalities with a population of 210,000. The plant was built in the late 90's for an average design flow of 22,000 m3/day and for a population of 150,000. It is currently being expanded for an average design flow of 36,500 m3/day and for a population of 210,000. BJIS provided the general design and complete detailed design services for both phases of construction, as well as the general supervision of construction. Basic Design Data Average Design Flow (m3/day): 36,500 Average B.O.D. Load (Kg/day): 17,000 Effluent Quality (BOD/TSS/N): 15/15/10 ![]()
Qyriat Shemona Regional Waste-Water Treatment Plant General Background The plant serves the municipalities of Qyriat Shemona, Metula, and several rural villages in the Upper Galilee regional council, with population equivalent of 50,000, and was built in 2000. The plant consists of semi-intensive facilities, i.e. a combination of anaerobic and aerated earth lagoons. BJIS provided general design and complete detailed design services as well as general supervision of construction. Basic Design Data Average Design Flow (m3/day): 14,500 Average B.O.D. Load (Kg/day): 5,150 Effluent Quality (BOD/TSS/N): 15/15/10 ![]()
Maa'yan Zvi Waste-water Treatment Plant General Background This W.W.T.P (presently under construction) serves the municipalities of Zikhron-Ya'aqov, Fureidis, and several of the rural villages belonging to the Hof-Carmel regional council, with a population of 45,000. BJIS provided the general design, complete detailed design services, and the general supervision of construction. Basic Design Data Average Design Flow (m3/day): 9,000 Average B.O.D. Load (Kg/day): 3,500 Effluent Quality (BOD/TSS/N): 10/20/15
Migdal Haemeq Waste-water Treatment Plant General Background This plant is a part of the regional project for the reuse of effluent in the Izrae'l valley. The plant serves the municipality of Migdal Haemeq, including it's extensive industrial area and several rural villages of the Izra'el regional council, with a population equivalent of 100,000. The plant was built in 1995. The plant consists of semi-intensive facilities, i.e. a combination of anaerobic and aerated earth lagoons. BJIS provided general design and complete detailed design services as well as general supervision of the construction. Basic Design Data Average Design Flow (m3/day): 15,000 Average B.O.D. Load (Kg/day): 7,000 Effluent Quality (BOD/TSS/N): 50/70/N.R ![]()
Nir Etzion Waste-Water Treatment Plant General Background This W.W.T.P (presently under construction) serves the municipalities of Ir-Karmel and several rural villages of Hof-Carmel regional council, with a population of 60,000. BJIS provided general design and complete detailed design services, as well as the general supervision of construction. Basic Design Data Average Design Flow (m3/day): 10,000 Average B.O.D. Load (Kg/day): 4,000 Effluent Quality (BOD/TSS/N): 15/20/15 ![]()
Ra'annana Filtration Plant General Background Ra'annana SBR WWTP produces secondary effluent quality. BJIS was assigned to design the filtration plant producing tertiary quality effluent (including integration of the existing disinfection facility). The plant is based on the Pressure Filtration Technology with a dual filtration media of intricate and quartz sand. The filtration components were manufactured by Amiad Filtration Systems. The facility is presently at the running-in stage. BJIS prepared the general and detailed designs including process, civil, mechanical, electrical, and control engineering, and provided general supervision on site. Basic Design Data Average Design Flow- first stage (m3/hr): 7,500 Average Design Flow - second stage (m3/hr):10,500 Influent Quality (BOD/TSS/P) (mg/l): 20/20/10 Effluent Quality (BOD/TSS/P) (mg/l): 10/10/5 ![]()
Shafdan (Greater Tel-Aviv) Sludge Treatment Facilities General Background The Shafdan WWTP presently treats approximately 370,000 cubic meters of wastewater per day, contributed by the entire Dan (Greater Tel-Aviv) Region. The wastewater is biologically treated by the Activated Sludge process, characterized by a short sludge age, typically 3 days (SRT), while the waste activated sludge (WAS) is discharged to the sea through an outfall pipe. According to a recently formed environmental policy, the discharge of WAS to the sea will be discontinued, and replaced by an alternative system of sludge disposal. BJIS prepared the general and the detailed designs of the sludge thickening and dewatering facility which will be required for any following process which will be selected for the sludge disposal. The services included process, civil, mechanical electrical, and control engineering, and general supervision of construction. Basic Design Data Volume of Waste Activated Sludge - WAS (m3/day): 25,600 - 32,000 WAS Solids Weight (Ton dry solids/day): 192 ![]()
Tel-Adashim Regional Waste-water Treatment Plant General Background This plant is a part of the regional project for the reuse of effluent in the Izra'el valley. This plant serves the municipalities of Nazareth, Nazerat-Illit, Yafia and several rural villages of Izra'el regional council, with a population equivalent of 150,000. The plant was originally built in 1994 (1st phase) and expanded during 2003 (2nd phase). At present the plant consists of semi-intensive facilities, i.e. a combination of anaerobic and aerated earth lagoons. Due to more updated and stringent regulation for the quality of the effluent to be reused in the Izra'el valley, a new B.N.R activated sludge module, designed by BJIS is now under construction. BJIS provided general and complete detailed design services for both phases of construction, and currently designs the new B.N.T Activated sludge module. Basic Design Data Average Design Flow (m3/day): 15,000 Average B.O.D. Load (Kg/day): 7,000 Effluent Quality (BOD/TSS/N): 50/70/N.R. ![]()
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
BALASHA-JALON Infrastructure Systems Ltd. - Ha'atzmaut Rd.31, P.O.Box 33600, Haifa 33600,
Tel: + 972 (4) 8603600, Fax: + 972 (4) 8603601, email: balasha@bj-is.com
All Rights Reserved to BALASHA-JALON 2009 ©
Built by
www.interserve.co.il