BALASHA-JALON Infrastructure Systems LTD. (BJIS)

                           בלשה-ילון מערכות תשתית בע"מ                                                                                                                                    

BALASHA-JALON Infrastructure Systems LTD. (BJIS)

  בלשה-ילון מערכות תשתית בע"מ

 

General Background

 

This water center provides drinking water and fire fighting supply to the city of Hadera having a population of 85,000.

 

BJIS prepared the general and detailed design including civil, mechanical, electrical, and control engineering and provided general supervision services at site.

 

Basic Design Facts:

 

  • Average Design Flow: 11,000 m3/day
  • Water Tank Volume – 5,000 m3
  • Maximum Design Hourly Flow: 1,100 m3/hour
  • Number of pumps: 4
  • Pumping station  duty point: Flow:1,100 m3/hour  Head:65 m

 

 

Hadera Water Center Pumping Station - Israel