General Background

 

Ein Bokek W.W.T.P serves all the hotels and the touristic facilities along the Dead-Sea areas of Ein-Bokek, Hamey-Zohar and Neve-Zohar as well as Tamar regional council.

 

The plant was originally built in the early 80's and expanded in the late 90's due to the accelerated construction activities within the touristic zones.

 

The plant consists of the original module plus two new modules.

A specific challenge here is the very high salinity value of the incoming wastes, due it's proximity to the Dead Sea. The process designed by BJIS successfully meets this challenge. 

 

The effluents are re-used for public gardening along the streets surrounding the hotels.

 

BJIS provided general design and complete detailed design services for the original construction and for the expansion.   

 

Basic Design Facts:

 

  • Average Design Flow (m3/day): 5,100
  • Average B.O.D. Load (Kg/day): 1,700
  • Effluent Quality (BOD/TSS/N): 15/15/10

 

 

  

 Liquid Process and Facilities

 

Main Process:

 

(high S.R.T)Activated Sludge, low F/M

 

Facilities:

 

  • Bar screens
  • Grit removal
  • Oxidation ditches with Orbal disc aerators
  • Final clarifiers
  • Effluent filtration and disinfection

 

  

 Sludge Process and Facilities

 

Main Process:

 

Aerobic Stabilization

  

 

Facilities:

 

  • Stabilization within reactors (high S.R.T)
  • Sludge tank
  • B.F.P. for dewatering

 

 

 

 

 

 

 

Ein Bokek WWTP - Israel